• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

All Zones Railway News In One Blog

Information of Special Trains, New Train List, New Facilities, Railway Fare Table

  • summer special trains
  • Railway Fare Table
  • MEGA BLOCK
  • Disclaimer


Train Fare Table 2020-2021
Pink Book 2022-23
Ganpati Festival Special Train 2022
Bharat Darshan Special Tourist Train 2022 List
Railway New Time Table From 01-01-2022
Indian Railway Budget Highlights

3rd Railway line between Tambaram- Chengalpattu

May 25, 2022 by wpadmin Leave a Comment

3rd Railway line between Tambaram- Chengalpattu

Shri Narendra Modi, Hon’ble PM will inaugurate the newly gauge converted Madurai-Teni section (75 Km), dedicate the 3rd line between Tambaram- Chengalpattu and lay foundation stone for the station redevelopment of Chennai Egmore, Katpadi, Madurai, Rameswaram and Kanniyakumari

  • Hon’ble PM to inaugurate Madurai – Teni section, dedicate the 3rd BG Line between Tambaram and Chenqalpattu. and lay the foundation stone for the redevelopment of Chennai Egmore, Katpadi, Madurai. Rameswaram & Kanniyakumari on 26lh May 2022
  • Hon’ble PM will inaugurate newly gauge converted Madurai – Teni 75 Km section – Cost of the project Rs. 506 Crore
  • Hon’ble PM will dedicate to the Nation 3rd Broad Gauge line project between Tambaram* Chengalpattu (30 Km) in the Chennai Suburban Network – Cost of the project Rs.598 Crore
  • Hon’ble PM will lay the foundation stone for the Redevelopment of 5 Railway stations in Tamil Nadu – Chennai Egmore, Katpadi, Madurai, Rameswaram, Kanniyakumari – Estimated total Cost of the project is Rs.1803 Crore

Shri Narendra Modi, Hon’ble Prime Minister of India will visit the state of Tamil Nadu on 26th of May 2022 and will dedicate, inaugurate and lay the foundation stone for several key infrastructural projects at Nehru Indoor Stadium.Chennai. The projects will play a crucial role in revitalizing the infrastructure of the states of Tamil Nadu. Karnataka and Andhra Pradesh thus accelerating its growth and development in many directions.

Among the Rail development projects for the State of Tamil Nadu, Hon’ble Prime Minister will inaugurate the newly gauge converted Madurai – Teni (75 Km) section completed at a cost of Rs.506 Crore. The section would Offer a reliable, faster and cheaper mode of transport, especially for agricultural purposes.

The Hon’ble Prime Minister will also dedicate to the Nation the 3rd Broad Gauge line between Tambaram and Chengalpattu (30 Km) completed at a cost of Rs.598 Crores. This new additional line in the arterial Chennai Suburban network will pave the way for introducing additional EMU train services in the section, besides improving the punctuality of Mail / Express trains and significantly reduce the travel time for Chennai suburban commuters.

The Hon’ble Prime Minister will also lay the foundation stone for the redevelopment of 5 railway stations in the state of Tamil Nadu, namely. Chennai Egmore. Katpadi, Madurai. Rameswaram and Kanniyakumari. The estimated total cost of redevelopment of these five stations is Rs.1803 Crore.

Apart from the above railway projects, Hon’ble Prime Minister will dedicate 1152 Houses constructed under Light House Project. Ennore – Chengalpet section of ETBPNMT Pipeline and Thiruvallur Bengaluru section of ETNPNMT Pipeline. Prime Minister will also lay the foundation stone for Chennai – Bengaluru Expressway project. 4 Lane Double Decker Elevated Road connecting Chennai Port to Maduravoyal (NH-4) Project. 4 Lane Neraluru to Dharmapuri section of NH-844 Project, Multi Modal Logistic Park at Chennai and 2 Lane with paved shoulders of Meensurutti to Chidambaram section of NH-227 from Km 98/433 to Km 129/965

Filed Under: Indian Railways Tagged With: Indian Railways

All information on the Site is provided in good faith, however, we do not express or implicitly state any representation or warranty regarding the accuracy, adequacy, validity, reliability, availability or completeness of any information on the Site. The above information is for general informational purposes only. This www.indianrailwayportal.in website has no affiliation with the Government site of Indian Railways and IRCTC. For more information, Passengers are requested to check the timings of desired train number and fare details on https://enquiry.indianrail.gov.in/ntes


AC Suburban Services between CSMT-Goregaon with effect from 3.1.2022

January 1, 2022 By wpadmin Leave a Comment

AC Suburban Services between CSMT – Goregaon with effect from 3.1.2022 Introduction of AC Suburban Services between CSMT and Goregaon on Harbour line Central Railway will introduce AC suburban services between CSMT and Goregaon / Vashi / Panvel/ Bandra on Harbour line (by replacing non-ac services) with effect from 3.1.2022. These AC services will be […]

South Central Railway New Time Table with effect from 01-01-2022

December 22, 2021 By wpadmin Leave a Comment

South Central Railway New Time Table with effect from 01-01-2022 Change in Train Timings with effect from 01.01.2022 There will be changes in the timings of several trains in the jurisdiction of South Central Railway with effect from 1st January, 2022. Passengers are requested to note the change in timings at the stations mentioned below […]

South Western Railway New Time Table with effect from 01-10-2021

October 11, 2021 By wpadmin Leave a Comment

South Western Railway New Time Table with effect from 01-10-2021 REVISION IN TIMINGS OF TRAINS WITH EFFECT FROM 2 OCT 2021 The timings of 175 special trains of South Western Railway and 87 trains of other railway-passing through SWR-are revised with effect from 2.10.2021. The list of the trains, with the details of timings is […]

CR New Time Table with effect from 01-10-2021

October 2, 2021 By wpadmin Leave a Comment

CR New Time Table with effect from 01-10-2021 Central Railway New Time Table with effect from 01-10-2021 Change of certain train timings in force from 1.10.2021 With effect from 1.10.2021, the timings of certain trains at stations on Central Railway have changed. The details can be checked on CR Trains at certain stations The changed […]

ECoR New Time Table with effect from 01-10-2021

September 30, 2021 By wpadmin Leave a Comment

East Coast Railway New Time Table with effect from 01-10-2021 The changed train timings at certain stations on Indian Railways can be checked on Trains on Railways Passengers are requested to check the timings of desired train number on https://enquiry.indianrail.gov.in/ntes to avoid any inconvenience ECoR ORIGINATING 11 TRAINS WILL HAVE REVISED TIMINGS AT VARIOUS STATIONS OVER […]

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Categories

  • Aastha Circuit Trains
  • Antyodaya Express
  • Bullet Train
  • CANCELLATION OF TRAINS
  • Circular Journey Tickets
  • Clone Trains
  • Concession in Indian Railways
  • Duronto Express
  • EXTENSION OF SERVICES
  • Extension of Trains
  • Ganpati Special Train
  • Holi Special Train List
  • Humsafar Express
  • Indian Railway Time Table
  • Indian Railways
  • IRCTC NEW RULES
  • JUMBO BLOCK
  • Konkan Railway
  • MAHAMANA EXPRESS
  • Makar Sankranti Special Train
  • MEGA BLOCK
  • MEMU trains
  • Metro Rail
  • Monsoon Train Time Table
  • Mumbai Local Train Time Table
  • Onam special trains
  • Pooja Festival Trains
  • Puja Special Trains
  • Railway Board Pink Book
  • Railway Budget
  • Railway Fare Chart
  • Railway Fare Table
  • RAILWAY NEW TIME TABLE
  • Sabarimala Special Trains
  • Special Trains
  • summer special trains
  • Tatkal Booking
  • Tejas Express
  • UDAY Express
  • Uncategorized
  • UNRESERVED SPECIAL TRAINS
  • Vande Bharat Express
  • Velankanni special train
  • Yatri Ticket Suvidha Kendra
  • YTSK

Copyright © 2022 · Magazine Pro on Genesis Framework · WordPress · Log in