Distribution Plan for Supply of Rail Neer on Mail/Exp. Trains and Static Units on Stations

April 5, 2018 by wpadmin Leave a Comment

Distribution Plan for Supply of Rail Neer on Mail/Exp. Trains and Static Units on Stations

GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY BOARD

No. 2015/TG-III/631/08

New Delhi, dated 04/04/2018

Principal Chief Commercial Managers,
All Zonal Railways.

The Chairman & Managing Director, IRCTC,
Barakhamba Road,
New Delhi – 110001.

The CMD, KRCL,
Belapur Bhawan. Navi Mumbai.

(Commercial Circular No. 20 of 2018)

Sub: Distribution Plan for Supply of Rail Neer on Mail/Exp. Trains and Static Units on Stations.

Ref: (i) IRCTC letter No. 2010/IRCTC/RNP/RBR/PT-II1 dated 16.01.2018 (ii) Board’s Letter of even no. dated 12/02/2016

This is in reference to IRCTC’s letter referred above and in continuation of instructions issued vide Board’s letter of even no. dated 12/02/2016 wherein detailed guidelines were issued for mandatory supply of Rail Neer on Mail/Express Trains and Static Units on stations. Following are advised:

1. Supply of 100% Rail Neer on Mail/Express trains and static units at stations has been reviewed in view of increase in production capacity of Rail Neer Packaged Drinking Water (PDW) by IRCTC due to commissioning of additional Rail Neer plants. It has been decided that supply of 100% Rail Neer on Mail/Express trains and static units at stations is to be ensured as per the revised list enclosed (Annexure-I) and these stations and trains are henceforth notified as mandatory units for supply of 100% Rail Neer.

2. The unit-wise demand has been indicated based on the mandatory requirement for the entire year and for non-peak season as projected/assessed by IRCTC.

3. For the purpose of this Circular No., non peak season is defined as following months : January, February, July, August, September, October, November, December.

4. Notification of the Units (Stations or Mail/Express trains), for mandatory supply of Rail Neer PDW, has been done on the basis of production capacity of the existing operational Rail Neer plants and supply thereof to the notified units as per list in the Annexure which has been linked to the concerned plant in vicinity depending upon the requirement of Rail Neer PDW vis-a-vis operational feasibility. However, in case production of the concerned plant is disrupted due to unforeseen circumstances or scheduled maintenance, IRCTC may provide Rail Neer PDW to notified units, as per list in Annexure, from alternate Rail Neer plants with prior intimation to the concerned PCCM of the Zonal Railway and Railway Board.

5. All other instructions regarding mandatory supply of Rail Neer PDW, on stations and Mail/Express trains, issued vide Ref. (ii) above will remain unchanged. IRCTC shall ensure 100% supply of Rail Neer on all Rajdhani, Shatabdi, Duronto, Gatiman, Tejas, Humsafar, Vistadome and other premium trains operating over entire Indian Railways in accordance with instructions issued vide Board’s letter No. 2015/TG-III/631/06 dated 27/01/2016.

6. The revision in the list of notified units as specified in the Annexure (stations and trains), where Rail Neer is to be provided mandatorily, would be undertaken and notified as and when new Rail Neer plants become operational.

This issues with the concurrence of Finance Dte. of Ministry of Railways.

Encl: As above (Annexure-I, 8 pages)

Sd/-
(P.P. Lathe)
Dy. Director (Tourism & Catering)
Railway Board

Source: indianrailways.gov.in

Filed Under: Indian Railways Tagged With: Indian Railways

All information on the Site is provided in good faith, however, we do not express or implicitly state any representation or warranty regarding the accuracy, adequacy, validity, reliability, availability or completeness of any information on the Site. The above information is for general informational purposes only. This www.indianrailwayportal.in website has no affiliation with the Government site of Indian Railways and IRCTC. For more information, Passengers are requested to check the timings of desired train number and fare details on https://enquiry.indianrail.gov.in/ntes


NR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

NR New Time Table with effect from 01-10-2022 Northern Railway New Time Table with effect from 01-10-2022 SALIENT FEATURE OF NORTHERN RAILWAYS NEW TIME TABLE EFFECTIVE FROM 01.10.2022 1. Change in Departure and Arrival Time of Trains at Terminals Revised timings of Departure of Trains: – Total Revised departures 87 trains Revised timings of Arrival […]

WR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

WR New Time Table with effect from 01-10-2022 Western Railway New Time Table with effect from 01-10-2022 VARIOUS IMPORTANT CHANGES IN THE NEW WESTERN RAILWAY MAIN LINE TIME TABLE W.E.F FROM 1st October, 2022 6 Pairs of Trains introduced and Change of Terminal / Destination in 8 trains In the new Western Zone Main Line […]

SER New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

SER New Time Table with effect from 01-10-2022 South Eastern Railway New Time Table with effect from 01-10-2022 SOUTH EASTERN RAILWAY REVISED TIMINGS OF SER’S TRAINS WITH EFFECT FROM 01.10.2022 South Eastern Railway, after reviewing the running of Trains has decided to revise the timings of the following trains programmed to run towards different important […]

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 उत्तर पश्चिम रेलवे : 01 अक्टूबर 2022 से नया टाइम टेबल – ट्रेनों के समय में होगा आंशिक बदलाव नई गाड़ियाँ,  गाड़ियों का विस्तार,  गाड़ियों के टर्मिनल में परिवर्तन, गाड़ी संख्या में परिवर्तन, गाड़ियों का मार्ग परिवर्तन, प्रायोगिक ठहराव प्रदान किये गए, दिनांक 01.10.22 से टर्मिनल […]

North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

NCR New Time Table with Effect from 01-10-2022 North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 दिनांक 01.10.2022 से प्रभावी आगामी नई समय सारणी – 2022 में किए गए परिवर्तनों का संक्षिप्त विवरण निम्नवत है – 1 . नई गाड़ियाँ – 1. गाड़ी सं. 20957 / 20958 इंदौर – नई […]

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Categories

  • Aastha Circuit Trains
  • Antyodaya Express
  • Bullet Train
  • CANCELLATION OF TRAINS
  • Circular Journey Tickets
  • Clone Trains
  • Concession in Indian Railways
  • Duronto Express
  • EXTENSION OF SERVICES
  • Extension of Trains
  • Ganpati Special Train
  • Holi Special Train List
  • Humsafar Express
  • Indian Railway Time Table
  • Indian Railways
  • IRCTC NEW RULES
  • JUMBO BLOCK
  • Konkan Railway
  • MAHAMANA EXPRESS
  • Makar Sankranti Special Train
  • MEGA BLOCK
  • MEMU trains
  • Metro Rail
  • Monsoon Train Time Table
  • Mumbai Local Train Time Table
  • Onam special trains
  • Pooja Festival Trains
  • Puja Special Trains
  • Railway Board Pink Book
  • Railway Budget
  • Railway Fare Chart
  • Railway Fare Table
  • RAILWAY NEW TIME TABLE
  • Sabarimala Special Trains
  • Special Trains
  • summer special trains
  • Tatkal Booking
  • Tejas Express
  • Trains At A Glance
  • UDAY Express
  • Uncategorized
  • UNRESERVED SPECIAL TRAINS
  • Vande Bharat Express
  • Velankanni special train
  • Yatri Ticket Suvidha Kendra
  • YTSK

Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in