• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

All Zones Railway News In One Blog

Information of Special Trains, New Train List, New Facilities, Railway Fare Table

  • summer special trains
  • Railway Fare Table
  • MEGA BLOCK
  • Disclaimer


Monsoon Train Time Table 2023 (10-06-2023 TO 31-10-2023)
Train Fare Table 2020-2021
Railway New Time Table From 01-10-2022
Indian Railway Budget Highlights

Installation of Water Vending Machines at Railway Stations

July 29, 2021 by wpadmin Leave a Comment

Installation of Water Vending Machines at Railway Stations

GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)

No. 2015/TG -III / 531/1

New Delhi
Dated: 18/03/2021

The Principal Chief Commercial Managers,
All Zonal Railways

(COMMERCIAL CIRCULAR NO. 04 OF 2021)

Addendum No.2 to Commercial Circular No.36 of 2015

Sub: Installation of Water Vending Machines (WVMs) at Stations.

Ref: (i) Board’s Commercial Circular No.36 of 2015 dated 16.06.2015.
(ii) Board’s Commercial Circular No. 16 of 2020 dated 08.07.2020.
(iii) WR’s letter no. C45/15/1/ (WVM) Vol. l dated 21.07.2020.
(iv) NCR’s letter no. C-65/Catg./ WVM/NCR dated 01.09.2020.

This refers to CC No. 36 of 2015 and CC No. 16 of 2020 wherein instructions regarding for installation of Water Vending Machines on 1R were issued. The extant guidelines have been examined and reviewed further by Board in view of observations made in the CVC/CTE’s report and clarifications sought by Zonal Railways and following is advised

1. PCCM of the concerned Zonal Railway, in consultation with Finance, is delegated powers to formulate the SBD for WVMs duly incorporating the provisions of extant WVM policy and any other special conditions to suit the technical and operational requirements w.r.t WVMs. Broad guidelines for formulation of SBD are enclosed as Annexure – 1.

2. Para 5.3 and Para 6 of CC N0.6 of 2015 are modified as under:-

Revised Para 5.3 The second packet (Packet-B) will consist of financial bid on license fee in lump sum terms over and above the minimum reserve price. 12% of assessed sales turnover expressed in lump sum terms should be fixed as Minimum License Fee.

Revised Para 6.0 LICENCE FEE

12% of assessed sales turnover expressed in lumpsum terms should be fixed as minimum reserve price in the tenders. Highest bidding in lumpsum terms subject to above minimum reserve price, will be fixed as the license fee.

PCCM of the concerned Zonal Railway, in consultation with finance, shall have full powers lo adopt criteria/ formula for sales turnover assessment for all category of stations which they deem fit depending upon local conditions and also keeping in view the Last Accepted Rate (LAB)/ footfall, volume of traffic of a similar station, for new stations.

At the time of renewal of the licenses or fresh bid for the license, license fee should be enhanced based on actual sales turnover of the unit subject to a minimum for 10% increase over the prevailing license fee of the unit.

There will be no additional charges payable except electricity and water charges, which will be based on actual consumption and chargeable as per Railways policy guidelines on this issue.

3. As regards Schedule of Power (SOP), Zonal Railways are advised to follow the extant instructions/ policy (Refer para 9.3.3 & 9.3.4 of CC No.20/2017 and Board’s letter No.2017/TG-lII/ 600/10 dated 22.09.2017) applicable for catering units in this regard.

4. In reference to Para 2 of the WVM Policy which specifically vests the power with DRMs to decide upon the WVM locations, based on passenger requirement, installation of WVMs in booking offices, waiting rooms etc may also be considered for inclusion in master plan.

5. The above instructions shall be applicable on the prospective tenders of WVM by Zonal Railway.

This issues with the concurrence of Finance (Commercial) Directorate of Ministry of Railways.

sd/-
(Sumeet Singh)
DTC (G) as Dir. (T&C)
Railway Board

Source: https://indianrailways.gov.in/

Filed Under: Indian Railways Tagged With: Indian Railways

All information on the Site is provided in good faith, however, we do not express or implicitly state any representation or warranty regarding the accuracy, adequacy, validity, reliability, availability or completeness of any information on the Site. The above information is for general informational purposes only. This www.indianrailwayportal.in website has no affiliation with the Government site of Indian Railways and IRCTC. For more information, Passengers are requested to check the timings of desired train number and fare details on https://enquiry.indianrail.gov.in/ntes


NR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

NR New Time Table with effect from 01-10-2022 Northern Railway New Time Table with effect from 01-10-2022 SALIENT FEATURE OF NORTHERN RAILWAYS NEW TIME TABLE EFFECTIVE FROM 01.10.2022 1. Change in Departure and Arrival Time of Trains at Terminals Revised timings of Departure of Trains: – Total Revised departures 87 trains Revised timings of Arrival […]

WR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

WR New Time Table with effect from 01-10-2022 Western Railway New Time Table with effect from 01-10-2022 VARIOUS IMPORTANT CHANGES IN THE NEW WESTERN RAILWAY MAIN LINE TIME TABLE W.E.F FROM 1st October, 2022 6 Pairs of Trains introduced and Change of Terminal / Destination in 8 trains In the new Western Zone Main Line […]

SER New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

SER New Time Table with effect from 01-10-2022 South Eastern Railway New Time Table with effect from 01-10-2022 SOUTH EASTERN RAILWAY REVISED TIMINGS OF SER’S TRAINS WITH EFFECT FROM 01.10.2022 South Eastern Railway, after reviewing the running of Trains has decided to revise the timings of the following trains programmed to run towards different important […]

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 उत्तर पश्चिम रेलवे : 01 अक्टूबर 2022 से नया टाइम टेबल – ट्रेनों के समय में होगा आंशिक बदलाव नई गाड़ियाँ,  गाड़ियों का विस्तार,  गाड़ियों के टर्मिनल में परिवर्तन, गाड़ी संख्या में परिवर्तन, गाड़ियों का मार्ग परिवर्तन, प्रायोगिक ठहराव प्रदान किये गए, दिनांक 01.10.22 से टर्मिनल […]

North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

NCR New Time Table with Effect from 01-10-2022 North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 दिनांक 01.10.2022 से प्रभावी आगामी नई समय सारणी – 2022 में किए गए परिवर्तनों का संक्षिप्त विवरण निम्नवत है – 1 . नई गाड़ियाँ – 1. गाड़ी सं. 20957 / 20958 इंदौर – नई […]

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Categories

  • Aastha Circuit Trains
  • Antyodaya Express
  • Bullet Train
  • CANCELLATION OF TRAINS
  • Circular Journey Tickets
  • Clone Trains
  • Concession in Indian Railways
  • Duronto Express
  • EXTENSION OF SERVICES
  • Extension of Trains
  • Ganpati Special Train
  • Holi Special Train List
  • Humsafar Express
  • Indian Railway Time Table
  • Indian Railways
  • IRCTC NEW RULES
  • JUMBO BLOCK
  • Konkan Railway
  • MAHAMANA EXPRESS
  • Makar Sankranti Special Train
  • MEGA BLOCK
  • MEMU trains
  • Metro Rail
  • Monsoon Train Time Table
  • Mumbai Local Train Time Table
  • Onam special trains
  • Pooja Festival Trains
  • Puja Special Trains
  • Railway Board Pink Book
  • Railway Budget
  • Railway Fare Chart
  • Railway Fare Table
  • RAILWAY NEW TIME TABLE
  • Sabarimala Special Trains
  • Special Trains
  • summer special trains
  • Tatkal Booking
  • Tejas Express
  • Trains At A Glance
  • UDAY Express
  • Uncategorized
  • UNRESERVED SPECIAL TRAINS
  • Vande Bharat Express
  • Velankanni special train
  • Yatri Ticket Suvidha Kendra
  • YTSK

Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in