• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

All Zones Railway News In One Blog

Information of Special Trains, New Train List, New Facilities, Railway Fare Table

  • summer special trains
  • Railway Fare Table
  • MEGA BLOCK
  • Disclaimer


Train Fare Table 2020-2021
Railway New Time Table From 01-10-2022
Indian Railway Budget Highlights

Pragati Ki Rail Gadi New Railway Line Dallirajhara-Raoghat-Jagdalpur

April 19, 2018 by wpadmin Leave a Comment

Pragati Ki Rail Gadi New Railway Line Dallirajhara-Raoghat-Jagdalpur

A Big Boost for Chhattisgarh: Prime Minister Shri Narendra Modi Inaugurates Railway Line in the Maoist Heartland

Prime Minister Shri Narendra Modi recently inaugurated a railway line and passenger train service in the insurgency-infested Kanker district in North Bastar, Chhattisgarh. The much-awaited railway line, which connects Dallirajhara in Balod district to Bhanupratappur in North Bastar was flagged off by the Prime Minister via video-conferencing on the birth anniversary of the architect of Constitution Dr Babasaheb Ambedkar at village Jangla in Bijapur district. The inaugural passenger train was run by all – women staff. Dallirajhara

The railway track is part of the rail project linking Dallirajhara – Raoghat – Jagdalpur, which is 235 km long. With the inauguration of the new line, North Bastar (Kanker) is linked to Durg – Raipur directly. Rowghat – Jagdalpur line will reduce rail distance between Raipur to Jagdalpur by about 260 kms. This will boost socio-economic interaction between the capital of Chattisgarh and backward areas in and around Bastar region.

Apart from boosting people to people interaction, this railway line will contribute to exploration and development of iron ore-rich Raoghat. At present Bhilai Steel Plant gets its iron- ore supplies from Dallirajhara mines. Iron ore reserves of these mines are depleting day by day. In future, Raoghat mines will be the primary source of iron ore for Bhilai Steel Plant.

Dallirajhara – Raoghat – Jagdalpur project is being executed in two phases Dallirajhara to Raoghat (95 kms) and Raoghat to Jagdalpur(140kms). The first phase is being executed by Rail Vikas Nigam Limited, a PSU under the Ministry of Railways. It is being funded completely by Steel Authority of India Limited. Out of total 95 kms two sections, Dallirajhara – Raoghat and Raoghat – Bhanupratappur, 17 kms each has been completed and dedicated to the nation. Work on the remaining section of 60 kms is in progress. The second phase between Raoghat to Jagdalpur (140 Kms )is being executed by IRCON, , a PSU under the Ministry of Railways. Cost of this phase is being shared between IRCON(26%), NMDC(43%), SAIL(21%) and Govt. of Chhattisgarh(10%).

This project after completion will bring remote, densely forested areas over rail map of Chhattisgarh. Raoghat will develop as growth point with forward and backward linkages and will have the overall positive impact on economic development of surrounding region. As this line will connect people of this region to Capital City Raipur, it would help open new opportunities of higher education and tertiary medical care for the people of this region. This rail line can truly be said as “Pragati Ki Railgaadi” for people of this region.

Source: PIB

Filed Under: Indian Railways Tagged With: Indian Railways

All information on the Site is provided in good faith, however, we do not express or implicitly state any representation or warranty regarding the accuracy, adequacy, validity, reliability, availability or completeness of any information on the Site. The above information is for general informational purposes only. This www.indianrailwayportal.in website has no affiliation with the Government site of Indian Railways and IRCTC. For more information, Passengers are requested to check the timings of desired train number and fare details on https://enquiry.indianrail.gov.in/ntes


NR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

NR New Time Table with effect from 01-10-2022 Northern Railway New Time Table with effect from 01-10-2022 SALIENT FEATURE OF NORTHERN RAILWAYS NEW TIME TABLE EFFECTIVE FROM 01.10.2022 1. Change in Departure and Arrival Time of Trains at Terminals Revised timings of Departure of Trains: – Total Revised departures 87 trains Revised timings of Arrival […]

WR New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

WR New Time Table with effect from 01-10-2022 Western Railway New Time Table with effect from 01-10-2022 VARIOUS IMPORTANT CHANGES IN THE NEW WESTERN RAILWAY MAIN LINE TIME TABLE W.E.F FROM 1st October, 2022 6 Pairs of Trains introduced and Change of Terminal / Destination in 8 trains In the new Western Zone Main Line […]

SER New Time Table with effect from 01-10-2022

October 3, 2022 By wpadmin Leave a Comment

SER New Time Table with effect from 01-10-2022 South Eastern Railway New Time Table with effect from 01-10-2022 SOUTH EASTERN RAILWAY REVISED TIMINGS OF SER’S TRAINS WITH EFFECT FROM 01.10.2022 South Eastern Railway, after reviewing the running of Trains has decided to revise the timings of the following trains programmed to run towards different important […]

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

North Western Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 उत्तर पश्चिम रेलवे : 01 अक्टूबर 2022 से नया टाइम टेबल – ट्रेनों के समय में होगा आंशिक बदलाव नई गाड़ियाँ,  गाड़ियों का विस्तार,  गाड़ियों के टर्मिनल में परिवर्तन, गाड़ी संख्या में परिवर्तन, गाड़ियों का मार्ग परिवर्तन, प्रायोगिक ठहराव प्रदान किये गए, दिनांक 01.10.22 से टर्मिनल […]

North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022

September 30, 2022 By wpadmin Leave a Comment

NCR New Time Table with Effect from 01-10-2022 North Central Railways Salient Features of New Time Table 2022 Effective from 01-10-2022 दिनांक 01.10.2022 से प्रभावी आगामी नई समय सारणी – 2022 में किए गए परिवर्तनों का संक्षिप्त विवरण निम्नवत है – 1 . नई गाड़ियाँ – 1. गाड़ी सं. 20957 / 20958 इंदौर – नई […]

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Categories

  • Aastha Circuit Trains
  • Antyodaya Express
  • Bullet Train
  • CANCELLATION OF TRAINS
  • Circular Journey Tickets
  • Clone Trains
  • Concession in Indian Railways
  • Duronto Express
  • EXTENSION OF SERVICES
  • Extension of Trains
  • Ganpati Special Train
  • Holi Special Train List
  • Humsafar Express
  • Indian Railway Time Table
  • Indian Railways
  • IRCTC NEW RULES
  • JUMBO BLOCK
  • Konkan Railway
  • MAHAMANA EXPRESS
  • Makar Sankranti Special Train
  • MEGA BLOCK
  • MEMU trains
  • Metro Rail
  • Monsoon Train Time Table
  • Mumbai Local Train Time Table
  • Onam special trains
  • Pooja Festival Trains
  • Puja Special Trains
  • Railway Board Pink Book
  • Railway Budget
  • Railway Fare Chart
  • Railway Fare Table
  • RAILWAY NEW TIME TABLE
  • Sabarimala Special Trains
  • Special Trains
  • summer special trains
  • Tatkal Booking
  • Tejas Express
  • Trains At A Glance
  • UDAY Express
  • Uncategorized
  • UNRESERVED SPECIAL TRAINS
  • Vande Bharat Express
  • Velankanni special train
  • Yatri Ticket Suvidha Kendra
  • YTSK

Copyright © 2023 · Magazine Pro on Genesis Framework · WordPress · Log in