• Skip to main content
  • Skip to primary sidebar

INDIAN RAILWAY PORTAL

Information of Special Trains,New Train List, New Facilities,Railway Fare Table



Request for Qualification (RFQ) for redevelopment of Chhatrapati Shivaji Maharaj Terminus (Mumbai) on PPP has been invited by IRSDC vide NIT published on 20.08.2020

August 24, 2020 by wpadmin Leave a Comment


Redevelopment of CSMT Railway Station

Request for Qualification (RFQ) for redevelopment of Chhatrapati Shivaji Maharaj Terminus (Mumbai) on PPP has been invited by IRSDC vide NIT published on 20.08.2020

The RFQ document is available on http://irsdc.enivida.com/

After the in principle approval of Public Private Partnership Appraisal Committee (PPPAC) for the redevelopment of Chhatrapati Shivaji Maharaj Terminus (Mumbai) Railway Station on PPP mode, Request for Qualification (RFQ) for redevelopment of Chhatrapati Shivaji Maharaj Terminus (Mumbai) on PPP has been invited by IRSDC vide NIT published on 20.08.2020. The RFQ document is available on http://irsdc.enivida.com/. The Pre Bid Conference is scheduled to take place on 22.09.2020. The Application due date is 22.10.2020.

The Applicants fulfilling the Eligibility Criteria shall be shortlisted for participating in further stage. The entire bidding procedure is a two-stage bidding process consisting of RFQ and Request for Proposal (RFP). The selected bidder at the RFP stage shall take up the redevelopment of the Railway station and commercial development of the surrounding railway land on leasehold basis upto 60 years for commercial development and upto 99 years for residential development on selected plots, along with operation and maintenance of the station for 60 years on concession basis. The user charge will also be another continuous source of revenue to the concessioner which will be available just after the Commercial Operation Date (COD) of the station.

The planning has been done by M/s AREP from France and discussions have been held with various stakeholders on periodic basis. The redevelopment cost of the station (mandatory cost) including the cost of financing and contingency etc. is Rs. 1642 crore. The investment opportunity for redevelopment is on DBFOT (Design, Build, Finance, Operate and Transfer) basis.

The Key salient features of the project are:

1. In principle approval of PPPAC comprising representatives from Ministry of Finance, Ministry of Law, Niti Aayog, Ministry of Railways etc, as per the Guidelines for PPP projects by Govt. of India;

2. The eligibility criteria is in terms of financial capacity at the RFQ stage and the net worth / ACI should be Rs 821 cr at the close of preceding financial year;

3. The construction and O&M experience capacity shall have to be met after the award of project but before the appointed date;

4. Extended O&M period of railway stations: For providing better passenger services and amenities, railway stations shall be on license with Concessionaire for 60 years;

5. Additional revenue stream: Pre-determined user charges (as notified by MoR) from railway station users as in practice in airports etc;

6. Long Term lease-rights for real estate: Upto 99 years for residential or mix use format & 60 years for non-residential formats. Upto 2.54 lakh sqm of Built up Area (tentative) is allowed for commercial development. Exact built up area allowed shall be known at the RFP stage;

7. No Change in Land use is required;

8. No prior environmental clearance is required from Ministry of Environment and Forest;

9. IRSDC will be a single window for approval of master plan and building plans in consultation with local authorities in terms of power conferred under Section 11 of Railway Act, 1989;

10. Alternate Investment Fund (AIF) or Foreign Investment Fund (FIF) are also eligible to participate; and

11. All Applicants who meet the qualification criteria shall be eligible to submit price bid at RFP stage, i.e., there is no upper cap for shortlisting of Applicants for RFP stage.

Follow IRSDC social media handles on Twitter (@irsdcinfo), Facebook (facebook.com/IRSDC) and LinkedIn (linkedin.com/company/ indian-railway-stations-development-corporation-limited) for recent updates. Do check our website: irsdc.in


Filed Under: Indian Railways Tagged With: Indian Railways

Revision in Timings of Trains Harihar-Hosapete (Train No.56529/Train No.56530)

November 4, 2019 By wpadmin Leave a Comment

Revision in Timings of Trains Harihar-Hosapete (Train No.56529/Train No.56530) The timings of Train No. 56529/56530 Harihar – Hosapete – Harihar Passenger will be revised with effect from 05.11.2019 as detailed below: Train No. 56529 Harihar – Hosapete Passenger will depart from Harihar at 06:30 hrs instead of 07:20 hrs and arrive at Hosapete at 12:10 […]

INTRODUCTION OF CIRCULAR TRAINS IN CHENNAI DIVISION AND TIME TABLE

April 23, 2019 By wpadmin Leave a Comment

Chennai Circular Train Time Table INTRODUCTION OF CIRCULAR TRAINS IN CHENNAI DIVISION As the detour line between Takkolam -Arakkonam was completed, the following circular train are introduced as special trains with effect from 23rd April, 2019. 1. Circular MEMU Train Special -1 Station Arrived / Departure timing Chennai Beach 10.30 hrs Arakkonam 12.30/ 12.35 hrs […]

Revised Timings of CSMT Mumbai-Hazrat Nizamuddin Rajdhani Express (Train No.22221/22222)

April 17, 2019 By wpadmin Leave a Comment

Revised Timings of CSMT Mumbai-Hazrat Nizamuddin Rajdhani Express New Time Table – CSMT Mumbai-Hazrat Nizamuddin Rajdhani Express (Train No.22221/ Train No.22222) Central Railway has revised the timings of 22221/22222 Rajdhani Express running between Chhatrapati Shivaji Maharaj Terminus Mumbai and Hazrat Nizamuddin with effect from 17.4.2019.The details are as under: Train No.22221   Station   Train […]

New Time Table Jaipur-Chandigarh Intercity Express Train No.19717/Train No.19718

January 23, 2019 By wpadmin Leave a Comment

New Time Table Jaipur-Chandigarh Intercity Express Train No.19717/Train No.19718 New Time Table Jaipur-Chandigarh Intercity Express Train No.19717/Train No.19718 (Daily) will be revised w.e.f. 24.4.2019 KIND ATTENTION RAIL PASSENGERS REVISIONS OF TRAIN TIMINGS FROM 24.04.2019 It is notified for the information of the passengers that timings of Train No. 19717/19718 Jaipur-Chandigarh (Daily) Intercity Express will be […]

Indian Railway Time Table Mumbai Central-Jaipur Train No 12955

January 18, 2019 By wpadmin Leave a Comment

Indian Railway Time Table Mumbai Central-Jaipur Train No 12955 Due to operational reasons, the timings of Train No. 12955 Mumbai Central – Jaipur has been revised. The below changes will be effective from 17th January, 2019: Train No. 12955 Mumbai Central – Jaipur Express arriving at Vadodara station at 00.34 hrs and departing at 00.44 […]

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar




Categories

  • Aastha Circuit Trains
  • Antyodaya Express
  • Bullet Train
  • CANCELLATION OF TRAINS
  • Circular Journey Tickets
  • Concession in Indian Railways
  • Duronto Express
  • EXTENSION OF SERVICES
  • Extension of Trains
  • Ganpati Special Train
  • Humsafar Express
  • Indian Railway Time Table
  • Indian Railways
  • IRCTC NEW RULES
  • JUMBO BLOCK
  • MAHAMANA EXPRESS
  • MEGA BLOCK
  • Metro Rail
  • Monsoon Train Time Table
  • Onam special trains
  • Pooja Festival Trains
  • Puja Special Trains
  • Railway Board Pink Book
  • Railway Budget
  • Railway Fare Chart
  • Railway Fare Table
  • RAILWAY NEW TIME TABLE
  • Sabarimala Special Trains
  • Special Trains
  • summer special trains
  • Tatkal Booking
  • Tejas Express
  • UDAY Express
  • Uncategorized
  • UNRESERVED SPECIAL TRAINS
  • Vande Bharat Express
  • Velankanni special train
  • Yatri Ticket Suvidha Kendra
  • YTSK

Copyright © 2021 · Magazine Pro on Genesis Framework · WordPress · Log in